happywork
Dołączył: 04 Sie 2016 Posty: 3083
|
Wysłany: Czw Cze 08, 2017 14:12 Temat postu: center to the edges of hammering cement |
|
|
<p>wood floor? Xiaobian to introduce you to anticorrosive wood floor construction technology, for you to solve the anticorrosive wood floor installation doubts! 1, anticorrosive wood floor before construction ready to clean up the construction site, the ground construction quality to meet the design requirements, do good waterproof, damp and vibration gas treatment. Will need to install the ground with screws and </p>
<p>galvanized steel bracket fixed keel, stainless steel screws on the front and the keel connection laying wood preservative. Determination of moisture content and deformation. 2, anticorrosive wood flooring keel in construction site leveling leveling the ground surface, no dust, prominent and construction waste, the instrument can be used to detect ground roughness. The ground level, with the keel link into a frame </p>
<p>or a frame structure, the laying of anti-corrosion wood. 3, in the process of design and construction of the wood structure, the air flow between the antiseptic wood and the ground should be fully maintained. 4, the installation of production installation of wood preservative wood preservative, the gap between the wood preservative for 0.2-1CM (according to the moisture content of wood and then decide the size </p>
<p>cost of 2 thick composite decking<br />
pvc waterproof laminate<br />
usa wood composite interior wall cladding</p> |
|